|
Home : Case
Histories : 8.6 - Khalda Petroleum Company
COMPANY AND FIELD LOCATION DETAILS
| SECTION |
8.6 |
COMPANY |
Khalda Petroleum Company |
| LOCATION |
Egypt |
REGION |
Middle East/North Africa |
| FIELD |
Salam |
NO.
OF WELLS |
1 - Salam 11 |
|
WELL DETAILS
| TYPE
OF WELL |
Water Supply Wells |
WELL
DEPTH |
7875ft |
| TUBULAR
SIZE/DETAILS |
4.1/2', 12.6ppf L80 R2 |
CONNECTION |
BTC |
| MAXTUBE
PRODUCT |
DUOLINE 20 |
OPERATING
TEMP. |
220oF (104oC) |
| H2S
PRESENT |
0% (0 ppm) |
CO2
PRESENT |
2.5% |
| FLUID
INJECTED |
n/a |
| ORIGINAL
INSTALLATION DATE |
7/2/04 |
| COMMENTS |
Production rate: 12000 to 13700 BWPD Completion details: ESP (HN-13500) Chloride: 80,000 to 90,000 ppm Flowing Bottom Hole Pressure: 3700 psi Flowing Tubing Head Pressure: 250 to 300 psi No of Tubing Joints: +/- 70 joints String composed of 2000ft of Duoline 20
|
|
Return
to the previous results page
For further information please use our General
Enquiry Form or for product selection please complete the DUOLINE Selection Form.
|